You are the NACE Level 2 Inspector with the final responsibility to prepare the final report for a very large structural steel shop project which has gone very well. It is due next week. The work has been ongoing for two years and several NACE Level 1 inspectors have worked under your supervision throughout the project. You find you are missing one week of daily reports for the night shift from the very beginning of the project and despite your best efforts they are cannot found. Your FIRST preferred course of action is to:


A. Re-create the reports as not much was going on during the night shift anyway
B. Plainly state in your report that they are missing
C. Do not complete your report until they can be found
D. Use creative writing to cover the fact they are missing



You have just your NACE CIP Level 2 certification when you are asked to supervise a team of uncertified field pipeline inspectors.
Your FIRST preferred course of action is to:

A. Accept assignment without hesitation
B. Advise the prospective employer that you cannot accept the position
C. Meet with the prospective employer to scope of your role
D. Review the NACE Attestation prior to making a decision


The most likely area of failure on a buried external pipeline coating is the:
A. Mainline coating
B. Field joint coating
C. Areas exposed to Ultra Violet light
D. Ground bed

Generally for safety considerations, water jetting hose connections use

A. an oil/water separator
B. a long wand
C. a whip-lock device
D. filters


[ 此帖被郑桂芬在2023-03-07 09:46重新编辑 ]
发帖
246
精华
0
绿叶
2420
小红花
365
只看该作者 沙发  发表于: 2023-03-07
Inspector reports should always be copied to:
A. All parties involved in the project
B. Whomever the Owner identifies
C. The Contractor and Owner
D. The Owner only

Which product, when closely inspected has a green or red layer of fusion bonded epoxy (FBE) that is visible directly on the steel?
A. 2-Layer Polyethylene (PE)
B. 3-Layer Polyethylene (PE)
C. Fusion Bonded Epoxy
D. Coal Tar Enamel

You are a NACE Level 2 in-house inspector working in a shop. Your in-house requires you to perform a sleeve test to test for soluble salts; however, the 3 rd party NACE Level 3 inspector, the owner, has a san smart meter and has achieved a very different result and has rejected the pre-cleaning.
Your FIRST course of action is to:

A. Advise the other inspector he is using an incorrect method
B. Redo the pre-cleaning based on the other inspector’s results
C. Review the specification with the other inspector to see what method was specified
D. Advise your QC Manager to change the ITP to the use of the salt smart meter



发帖
3343
精华
7 篇
绿叶
45
小红花
5213
只看该作者 板凳  发表于: 2023-03-12
回 郑桂芬 的帖子
郑桂芬:Inspector reports should always be copied to:
A. All parties involved in the project
B. Whomever the Owner identifies
C. The Contractor and Owner
D. The Owner only
....... (2023-03-07 09:48) 

施工一线的朋友英语不一定懂,请配合中英文对照,便于阅读。
共有1人赞这个帖子绿叶+1
廖受立 绿叶 +1 来自防腐蚀论坛app的点赞 2023-03-20
做一个能干能写的防腐蚀老兵(30多年的防腐蚀施工)

发帖
5
精华
0
绿叶
11
小红花
1
只看该作者 地板  发表于: 2023-06-19
BDBCDCC